Materials Consultant

Transfield Hofincons InfoTech & Industrial Services Pvt. Ltd - India

12-01-2003

08-31-2005

  1. Aug 2004 – Aug 2005: Qatar Petroleum, Offshore fields – HALUL/PS-02, Qatar seconded by CDC

Project: GTC- 140 Maintenance Data Acquisition and Optimization for SAP implementation

Responsibilities

  • Physical verification of all Equipment’s (with reference to P&ID and SLD) and update P&ID/SLD
  • Prepare Master Functional Location and Equipment list (Technical Objects)
  • Equipment Hierarchy Preparation
  • Preparation of Bills of Materials
  • Functional and Equipment Criticality Analysis (Electrical)
  • Review Document’s P&ID/SLD, Specification Sheet, O&M Manual, etc. and link to Functional Locations.

 

  1. Jun 2004 – Jul 2004: Grasim Industries Ltd - 12.5 MW Thermal Power Plant, India

Project: Maintenance Data Acquisition and Optimization for SAP implementation

Responsibilities

  • Physical verification of Plant Equipment’s
  • Prepare Master Functional Location and Equipment list
  • MAP Equipment Hierarchy
  • Functional and Equipment Criticality Analysis (Electrical)
  • Develop PM Procedure for Electrical Equipment’s

 

  1. Mar 2004 – May 2004: Abu Dhabi Marine Operating Company (ADMA)

Project: Equipment Hierarchy and Criticality Database for MAXIMO

Responsibilities

  • Prepare Master Functional Location and Equipment list, with reference to SLD
  • MAP Equipment Hierarchy
  • Functional and Equipment Criticality analysis

 

  1. Dec 2003 – Feb 2004: Gas Authority of India LTD (GAIL), India

Project: Corporate Cataloguing / Materials Master Development

Responsibilities

  • Part of the team that developed corporate Materials Master for 23 locations, cataloguing for approx. of 286,000 materials, rationalizing to 110,000 codes
  • Created 10 Digits Intelligent Coding System for all Materials
  • Conducted cross reference study and rationalized the spare parts